Initially requested at 0128 hours to standby in station while Broadalbin FD was en-route to a possible structure fire. While en-route firefighter on scene confirmed working structure fire. Broadalbin 2-5-1 then requested Perth to the scene with and engine/manpower and a tanker. 12-5-3, 12-1-1 and 12-2-2 responded. 12-1-1's crew and 12-2-2 driver packed up and assisted with extinguishing the fire. 12-2-2 tanker was not needed due to the location of a water source next to the fire. 15 members responded, back in service at 0720 hours.